Summary for Test 2022-07-21-54-1
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 215109 DEA: 081C8504 EFIS: 0813000047 |
---|---|
DIST-CO-RTE-PM | 08-RIV-74-0.0/5.8 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | ROADWAY EXCAVATION, HOT MIX ASPHALT, AND STRUCTURAL SHOTCRETE WALLS. |
Location Description | RIVERSIDE COUNTY NEAR LAKE ELSINORE FROM ORANGE COUNTY LINE TO MONTE VISTA STREET |
QA Service Level | 1 (Verified on 02/24/2021) |
Sample Information
Sample Taken Date | 07/21/2022 | Sample Unique Key | 54 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/10/2022 |
Sample type | Per Request | A brief description of the sample | PG asphalt Binder |
The quantity of what the sample constitutes | 1 Quart Can | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Granite QC | Last name of sampler or witnessed by | Granite QC |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0535-22 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | California Commercial Asphalt - Lake Elsinore | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-28 M |
---|---|---|---|
Modified | Yes | Lot number | |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | ||
Certified Asphalt Supplier | Valero Marketing & Supply - Benicia CA | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2022-07-21-54
DIME Test ID: 2022-07-21-54-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2022-08-18
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Babak Rezaei
Date of test: 08/11/2022
Any material loss from containers during heating process/testing?: No
Mass of empty container #1: 167.309 grams
Mass of empty container #2: 176.522 grams
Mass of container #1 before test (m1i): 202.376 grams
Mass of container #2 before test (m2i): 211.485 grams
Mass of container #1 after test (m1f): 202.209 grams
Mass of container #2 after test (m2f): 211.315 grams
Average mass change: -0.481 percent
General comments (publicly viewable) (Max 1000 characters): -0.481+0.006=-0.475
Test was verified on 8/18/2022 ✔