Summary for Test 2022-07-01-42-1
Test performed: CTM 231-March 2013Project Information
Project Identifiers | Project ID: 215221 DEA: 07332604 EFIS: 0716000287 |
---|---|
DIST-CO-RTE-PM | 07-LA-10-R12.4/14.9 |
Award Date | 12/16/2020 |
Closeout Date | 11/25/2024 |
Work Description | REMOVE RAISED ISLAND, CONSTRUCT CONCRETE BARRIER AND INSTALL LIGHTING. |
Location Description | THE COUNTY AND CITY OF LOS ANGELES FROM 0.1 MILE EAST OF ARLINGTON AVENUE OVERCROSSING TO 0.7 MILE EAST OF ROUTE 10/110 SEPARATION |
QA Service Level | 1 (Verified on 03/19/2021) |
Sample Information
Sample Taken Date | 07/01/2022 | Sample Unique Key | 42 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/01/2022 |
Sample type | Department Acceptance | A brief description of the sample | Aggregate Base |
The quantity of what the sample constitutes | 1400 yd2 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Rosauro | Last name of sampler or witnessed by | Nogoy |
Title of sampler | TEC | Telephone number of sampler | 2137939321 |
Laboratory sample identification | 22-1636 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | N/A | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
---|---|---|---|
The fabricator/manufacturer designation for the sample | Aggregate Base | A detailed description of where the material sample was collected | From various locations at base |
Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2022-07-01-42
DIME Test ID: 2022-07-01-42-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-07-13
Test Results
Method Type:: Direct Read
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: Rosauro Nogoy
Date of test: 07/01/2022
Gage No.: 60202
Test No.: 1
Nuclear By: Rosauro Nogoy
Non-Bias Plan No.: 2
Depth: 7 in
Material No.: Imported Material
Material Type: Aggregate Base
Impact By: Rosauro Nogoy
Standard Count Density: 2400 g/cc
Count or Density 1: 2.03 g/cc
Count or Density 2: 2.05 g/cc
Count or Density 3: 2 g/cc
Count or Density 4: 2.05 g/cc
Count or Density 5: 2.02 g/cc
Standard Count Moisture: 629 g/cc
Moisture Count 1: 0.13 g/cc
Moisture Count 2: 0.13 g/cc
Moisture Count 3: 0.12 g/cc
Moisture Count 4: 0.13 g/cc
Moisture Count 5: 0.11 g/cc
Sum of Count or Density: 10.15 g/cc
Average of Count or Density: 2.03 g/cc
Sum of Moisture Count: 0.62 g/cc
Average of Moisture Count: 0.12 g/cc
Calculated Percent Relative Compaction: 95.8 %
Reported Percent Relative Compaction: 96 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/13/2022 ✔