Project Details
This page displays current information for project DEA: 07332604.
Project Information
Project Identifiers | Project ID: 215221 DEA: 07332604 EFIS: 0716000287 |
---|---|
DIST-CO-RTE-PM | 07-LA-10-R12.4/14.9 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | REMOVE RAISED ISLAND, CONSTRUCT CONCRETE BARRIER AND INSTALL LIGHTING. |
Location Description | THE COUNTY AND CITY OF LOS ANGELES FROM 0.1 MILE EAST OF ARLINGTON AVENUE OVERCROSSING TO 0.7 MILE EAST OF ROUTE 10/110 SEPARATION |
QA Service Level | 1 (Verified on 03/19/2021) |
Samples
Samples submitted for this project.
Displaying 1-10 of 22 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-04-14-15 | 04/14/2022 | 04/14/2022 | Acceptance | Soil | View |
2022-04-12-8 | 04/12/2022 | 04/12/2022 | Acceptance | Soil | View |
2022-04-09-1 | 04/09/2022 | 04/09/2022 | Acceptance | Soil | View |
2022-02-08-44 | 02/08/2022 | 02/12/2022 | Acceptance | Aggregate | View |
2021-12-07-6 | 12/07/2021 | 12/07/2021 | Acceptance | Concrete | View |
2021-12-07-7 | 12/07/2021 | 12/07/2021 | Acceptance | Concrete | View |
2021-12-07-8 | 12/07/2021 | 12/07/2021 | Acceptance | Concrete | View |
2021-11-04-1 | 11/04/2021 | 11/09/2021 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2021-11-02-11 | 11/02/2021 | 11/03/2021 | Acceptance | Hot Mix Asphalt | View |
2021-11-02-12 | 11/02/2021 | 11/04/2021 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted by | DIME Sample ID | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs submitted for this project.
Declaration Number | Program Operator | Material Type | Vendor | Submitted by |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods