Summary for Test 2022-06-15-16-1
Test performed: CTM 231-March 2013Project Information
| Project Identifiers | Project ID: 215221 DEA: 07332604 EFIS: 0716000287 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-10-R12.4/14.9 |
| Award Date | 12/16/2020 |
| Closeout Date | 11/25/2024 |
| Work Description | REMOVE RAISED ISLAND, CONSTRUCT CONCRETE BARRIER AND INSTALL LIGHTING. |
| Location Description | THE COUNTY AND CITY OF LOS ANGELES FROM 0.1 MILE EAST OF ARLINGTON AVENUE OVERCROSSING TO 0.7 MILE EAST OF ROUTE 10/110 SEPARATION |
| QA Service Level | 1 (Verified on 03/19/2021) |
Sample Information
| Sample Taken Date | 06/15/2022 | Sample Unique Key | 16 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/15/2022 |
| Sample type | Department Acceptance | A brief description of the sample | Subgrade |
| The quantity of what the sample constitutes | 2000 sq. yd. | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Philip | Last name of sampler or witnessed by | Maquiran |
| Title of sampler | MREA | Telephone number of sampler | 2133581518 |
| Laboratory sample identification | 22-1430 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Chumo Construction Inc. | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | From various location at subgrade | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2022-06-15-16
DIME Test ID: 2022-06-15-16-1
Testing Lab: CT D07 - Materials Field Laboratory, Unit 1953
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-06-16
Test Results
Method Type:: Direct Read
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Calculated
Tester's full name: Phillip Maquiran
Date of test: 06/15/2022
Sum of Count or Density: 10.49 g/cc
Average of Count or Density: 2.1 g/cc
Sum of Moisture Count: 0.81 g/cc
Average of Moisture Count: 0.16 g/cc
Calculated Percent Relative Compaction: 95 %
Reported Percent Relative Compaction: 95 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/16/2022 ✔