Summary for Test 2022-05-26-11-1

Test performed: CTM 231-March 2013

Project Information

Project IdentifiersProject ID: 212112
DEA: 080C2514
EFIS: 0816000076
COOP: 081645
DIST-CO-RTE-PM08-SBD-10-0.0/13.2
Award Date06/06/2018
Closeout DateNot set
Work DescriptionDesign-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes
Location DescriptionLA/SBD County Line to PM 13.2 near I-15
QA Service Level1 (Verified on 10/16/2019)

Sample Information

Sample Taken Date05/26/2022 Sample Unique Key11
Date that the sample was received by the laboratory/organization performing the testing05/26/2022 Sample typeQuality Assurance
A brief description of the sampleSoil The quantity of what the sample constitutes14400 SQF
From where was the sample collectedJob Site First name of sampler or witnessed byALESKY
Last name of sampler or witnessed byS Title of samplerCaltrans Consultant
Telephone number of sampler Laboratory sample identification05262022 TEST 01
Linked DIME Sample ID The fabricator/manufacturer/facility nameCTM 231 TEST LOCATION
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSoil The fabricator's/manufacturer's product name for the sampleomar G G
The fabricator/manufacturer designation for the sample A detailed description of where the material sample was collectedAT THE JOB SITE
Where the material sample would have been placed if not sampled

Test Details

DIME Sample ID: 2022-05-26-11
DIME Test ID: 2022-05-26-11-1
Testing Lab: CT D08 - Barstow Field Laboratory 1
Test Method: CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear Gages
Test Release Date: 2022-05-27

Test Results


Method Type:: Standard Count
Number of Tests:: 5
Common Test Maximum Used:: No
Input Type: Measured
Tester's full name: ALESKY S
Date of test: 05/26/2022
Gage No.: 67422
Test No.: 1
Nuclear By: ALESKY S
Non-Bias Plan No.: 6
Depth: 12
Material No.: NATIVE
Material Type: SUBGRADE
Impact By: ALESKY S
Standard Count Density: 2008
Count or Density 1: 335
Count or Density 2: 321
Count or Density 3: 288
Count or Density 4: 267
Count or Density 5: 275
Standard Count Moisture: 607
Moisture Count 1: 85
Moisture Count 2: 99
Moisture Count 3: 114
Moisture Count 4: 131
Moisture Count 5: 104
Sum of Count or Density: 1486
Average of Count or Density: 297
Sum of Moisture Count: 533
Average of Moisture Count: 107
Count Ratio Density: 0.15
Count Ratio Moisture: 0.18
Calculated Percent Relative Compaction: 97.4 %
Reported Percent Relative Compaction: 97 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 5/27/2022 ✔