Summary for Test 2022-05-13-26-2
Test performed: ASTM C143-20Project Information
Project Identifiers | Project ID: 212112 DEA: 080C2514 EFIS: 0816000076 COOP: 081645 |
---|---|
DIST-CO-RTE-PM | 08-SBD-10-0.0/13.2 |
Award Date | 06/06/2018 |
Closeout Date | Not set |
Work Description | Design-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes |
Location Description | LA/SBD County Line to PM 13.2 near I-15 |
QA Service Level | 1 (Verified on 10/16/2019) |
Sample Information
Sample Taken Date | 05/13/2022 | Sample Unique Key | 26 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/13/2022 |
Sample type | Quality Control | A brief description of the sample | 1 cubic ft. of Concrete taken from middle of batching |
The quantity of what the sample constitutes | 1 cubic ft. of Concrete for Testing | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Mark Patrick | Last name of sampler or witnessed by | Baddu |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Con-Fab California, LLC | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | VER-98LV |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 4932 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | Bed 1B, 4th Truck | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2022-05-13-26
DIME Test ID: 2022-05-13-26-2
Testing Lab: Con-Fab California Corporation - Lathrop
Test Method: ASTM C143-20: Standard Test Method for Slump of Hydraulic-Cement Concrete
Test Release Date: 2022-05-18
Test Results
Input Type: Calculated
Tester's full name: Abraham Luna
Date of test: 05/13/2022
Slump: 23 inch
General comments (publicly viewable) (Max 1000 characters): Flow: 23"
VSI: 0
Test was verified on 5/18/2022 ✔