Summary for Test 2022-03-17-15-1
Test performed: AASHTO T308-10Project Information
Project Identifiers | Project ID: 213707 DEA: 081C38U4 EFIS: 0817000196 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10-6.7/R25.1 |
Award Date | 11/26/2019 |
Closeout Date | 11/01/2023 |
Work Description | Remove concrete pavement and base, and place HMA and JPCP |
Location Description | ROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON. |
QA Service Level | 1 (Verified on 01/09/2020) |
Sample Information
Sample Taken Date | 03/17/2022 | Sample Unique Key | 15 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/22/2022 |
Sample type | Department Acceptance | A brief description of the sample | 3/4" HMA-A-SP R24 0.5% LAS |
The quantity of what the sample constitutes | 2 Boxes 252.79 Tons Out | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Ruben | Last name of sampler or witnessed by | Fernando |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0176A-22 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | CCA Coachella | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | |
Sublot number | HMA Mix Number | Not set |
Test Details
DIME Sample ID: 2022-03-17-15
DIME Test ID: 2022-03-17-15-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2022-03-29
Test Results
What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Ayman Nabulsi
Date of test: 03/26/2022
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 4.33 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/29/2022 ✔