Summary for Test 2021-12-30-4-3
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 215744 DEA: 033H93U4 EFIS: 0321000091 |
|---|---|
| DIST-CO-RTE-PM | 03-YUB,BUT-70-25.5/25.8,0.0/3.8 |
| Award Date | 07/15/2021 |
| Closeout Date | 07/15/2025 |
| Work Description | WIDEN ROADWAY & SHOULDER, ADD TURN LANES & CONSTRUCT BRIDGE. |
| Location Description | YUBA AND BUTTE COUNTIES ABOUT 11 MILES NORTH OF MARYSVILLE FROM 0.8 MILE NORTH OF CHANDLER ROAD TO 0.2 MILE SOUTH OF EAST GRIDLEY ROAD |
| QA Service Level | 1 (Verified on 05/20/2021) |
Sample Information
| Sample Taken Date | 12/30/2021 | Sample Unique Key | 4 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/31/2021 |
| Sample type | Quality Assurance | A brief description of the sample | #6 Hoops 5'-8" Dia. |
| The quantity of what the sample constitutes | 12 hoops from lot 1, 4, 8 | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | ADRIAN | Last name of sampler or witnessed by | Sanchez |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | T.N.T. Rebar | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | L159-003-21 | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Welded Hoops | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Rebar Heat Number(s) | Lot 1,4 HT3500022242, Lot 8 HT1201037611 |
| Hoop Manufacturer Lot Number(s) | LOT 1,4,8 | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Size | #6 |
| Diameter of Hoop | 5'-8" | Epoxy Coated | No |
| Epoxy Coating Color | NA | Rebar Manufacturer | Nucor |
| Welding Company | TNT Rebar Company | Coating Standards | Uncoated |
| Weld Type | Flash Welded |
Test Details
DIME Sample ID: 2021-12-30-4
DIME Test ID: 2021-12-30-4-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)
Test Release Date: 2022-01-10
Test Results
Number of Samples: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 01/07/2022
UTM: 400kip
Temperature: 72 f
| Num | Sample | Mfg. Lot Number(s) | Size | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|
| 1 | 3 | 1 | 6/19mm | 0.44 | 44928.23 | 102110 | Ok Necking | bewing |
General comments (publicly viewable) (Max 1000 characters): Ok Necking
Test Graph
Source: Bluehill Data Point FileTest graph for the Sample
Test was verified on 1/10/2022 ✔