Sample Record
Owner Lab
- CT HQ - QASI Los Angeles Field Office
DIME Sample ID 2021-12-30-4
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 215744 DEA: 033H93U4 EFIS: 0321000091 |
---|---|
DIST-CO-RTE-PM | 03-YUB,BUT-70-25.5/25.8,0.0/3.8 |
Award Date | 07/15/2021 |
Closeout Date | Not set |
Work Description | WIDEN ROADWAY & SHOULDER, ADD TURN LANES & CONSTRUCT BRIDGE. |
Location Description | YUBA AND BUTTE COUNTIES ABOUT 11 MILES NORTH OF MARYSVILLE FROM 0.8 MILE NORTH OF CHANDLER ROAD TO 0.2 MILE SOUTH OF EAST GRIDLEY ROAD |
QA Service Level | 1 (Verified on 05/20/2021) |
Sample Information
Sample Taken Date | 12/30/2021 | Sample Unique Key | 4 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/31/2021 |
Sample type | Quality Assurance | A brief description of the sample | #6 Hoops 5'-8" Dia. |
The quantity of what the sample constitutes | 12 hoops from lot 1, 4, 8 | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | ADRIAN | Last name of sampler or witnessed by | Sanchez |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | T.N.T. Rebar | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | L159-003-21 | Structure unique identifier | |
Structure name |
Material Information
Material Type | SMTL TM5 - Welded Hoops | Production or Authorization Testing | Production Testing |
---|---|---|---|
Service or Ultimate | Ultimate | Rebar Heat Number(s) | Lot 1,4 HT3500022242, Lot 8 HT1201037611 |
Hoop Manufacturer Lot Number(s) | LOT 1,4,8 | Material Standard Code | ASTM A706 |
Material Grade | 60 | Rebar Size | #6 |
Diameter of Hoop | 5'-8" | Epoxy Coated | No |
Epoxy Coating Color | NA | Rebar Manufacturer | Nucor |
Welding Company | TNT Rebar Company | Coating Standards | Uncoated |
Weld Type | Flash Welded |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2021-12-30-4-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-12-30-4-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-12-30-4-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-12-30-4-4 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-12-30-4-5 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-12-30-4-6 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-12-30-4-7 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-12-30-4-8 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-12-30-4-9 CTM 670-December 2013 (Verified)