Summary for Test 2021-09-11-10-1
Test performed: CTM 557-June 2020Project Information
Project Identifiers | Project ID: 215396 DEA: 042K8404 EFIS: 0417000031 |
---|---|
DIST-CO-RTE-PM | 04-SOL-29,80-0.0,0.8/1.6 |
Award Date | 03/26/2021 |
Closeout Date | 02/16/2024 |
Work Description | HMA, STRUCTURAL CONCRETE, CIDH PILING AND REBAR. |
Location Description | SOLANO COUNTY IN VALLEJO AT ROUTE 80/29 SEPARATION AND ON ROUTE 80 FROM 0.2 MILE NORTH OF CARQUINEZ BRIDGE TOLL PLAZA TO 0.3 MILE SOUTH OF MAGAZINE STREET OVERCROSSING |
QA Service Level | 1 (Verified on 01/25/2021) |
Sample Information
Sample Taken Date | 09/11/2021 | Sample Unique Key | 10 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 09/11/2021 |
Sample type | Quality Control | A brief description of the sample | Concrete |
The quantity of what the sample constitutes | 100 cy | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Pedro | Last name of sampler or witnessed by | De Haro |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Cemex | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | 1613820 |
---|---|---|---|
The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 29849433 | |
Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
A detailed description of where the material sample was collected | CDIH Foundation Stage 1 Abutment 3 Pile 3 | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2021-09-11-10
DIME Test ID: 2021-09-11-10-1
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 557-June 2020: Method of Test for Temperature of Freshly Mixed Hydraulic Cement Concrete
Test Release Date: 2022-04-13
Test Results
Input Type: Calculated
Tester's full name: Pedro De Haro
Date of test: 09/11/2021
Temperature: 79 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 4/13/2022 ✔