Summary for Test 2021-11-02-10-4

Test performed: CTM 670-December 2013

Project Information

Project IdentifiersProject ID: 212112
DEA: 080C2514
EFIS: 0816000076
COOP: 081645
DIST-CO-RTE-PM08-SBD-10-0.0/13.2
Award Date06/06/2018
Closeout DateNot set
Work DescriptionDesign-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes
Location DescriptionLA/SBD County Line to PM 13.2 near I-15
QA Service Level1 (Verified on 10/16/2019)

Sample Information

Sample Taken Date11/02/2021 Sample Unique Key10
Date that the sample was received by the laboratory/organization performing the testing11/22/2021 Sample typePer Request
A brief description of the sample#6 Dayton Superior Bar Lock The quantity of what the sample constitutes10
From where was the sample collectedJob Site First name of sampler or witnessed byNestor
Last name of sampler or witnessed byAlverez Title of samplerInspector
Telephone number of sampler(909) 649-7610 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCMC Rebar
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameVineyard
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC Rebar
Coupler ManufacturerDayton Superior Intermediate Assembler or Fabricator
Rebar Size#6 Coupler ModelBar Lock S/CA
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)4000000953 Rebar Heat Number(s)4111899
Rebar Size 2 Coupler Unique IDNot set

Test Details

DIME Sample ID: 2021-11-02-10
DIME Test ID: 2021-11-02-10-4
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2021-11-29

Test Results


Number of Samples Tested: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 11/23/2021
UTM: 400kip
Temperature: 72.00 f
Halo ID:
NumSampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
14No. 6/19mm100.443591181617Service Splicebewing

General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.

Test was verified on 11/29/2021