Summary for Test 2021-11-13-8-4
Test performed: AASHTO T240-17Project Information
Project Identifiers | Project ID: 7613 DEA: 071218W4 EFIS: 0700021119 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-29.4/31.6 |
Award Date | 11/29/2012 |
Closeout Date | 07/31/2023 |
Work Description | REALIGN ROUTE 5 AND RAILROAD TRACKS AND RECONFIGURE ON- AND OFF-RAMPS. |
Location Description | LOS ANGELES COUNTY IN BURBANK FROM WEST MAGNOLIA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF BUENA VISTA STREET/WINONA AVENUE UNDERCROSSING |
QA Service Level | 1 (Verified on 10/08/2012) |
Sample Information
Sample Taken Date | 11/13/2021 | Sample Unique Key | 8 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/16/2021 |
Sample type | Per Request | A brief description of the sample | PG Asphalt Binder |
The quantity of what the sample constitutes | 1 Quart Can | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Cesar | Last name of sampler or witnessed by | Gomez |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0637-21 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Vulcan-Sun Valley | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
---|---|---|---|
Modified | No | Lot number | |
Sublot number | Tank number | ||
Time of sample | HMA Supplier | ||
Certified Asphalt Supplier | Valero Marketing & Supply - Benicia CA | Multigrade | No |
Multigrade Type | Asphalt Binder Mix Number | Not set |
Test Details
DIME Sample ID: 2021-11-13-8
DIME Test ID: 2021-11-13-8-4
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-17: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2021-11-19
Test Results
Is mass change based on one or two containers?: Two
Input Type: Measured
Tester's full name: Babak Rezaei
Date of test: 11/17/2021
Any material loss from containers during heating process/testing?: Yes
Mass of empty container #1: 169.378 grams
Mass of empty container #2: 166.191 grams
Mass of container #1 before test (m1i): 204.337 grams
Mass of container #2 before test (m2i): 201.165 grams
Mass of container #1 after test (m1f): 204.233 grams
Mass of container #2 after test (m2f): 201.069 grams
Average mass change: -0.286 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 11/19/2021 ✔