Summary for Test 2021-10-13-25-4
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 215188 DEA: 080F5434 EFIS: 0817000239 Permit Numbers: 0823NMC0369 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-I-15,SR-91-6.1-7.6 |
| Award Date | 03/11/2020 |
| Closeout Date | 06/05/2024 |
| Work Description | I-15 ELC: 15/91 Express Lanes Connector Project (ELC) |
| Location Description | Junction of I-15 and SR-91 in Corona, CA |
| QA Service Level | 1 (Verified on 09/16/2020) |
Sample Information
| Sample Taken Date | 10/13/2021 | Sample Unique Key | 25 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 10/15/2021 |
| Sample type | Quality Assurance | A brief description of the sample | Barsplice Zap Screwlok Coupler |
| The quantity of what the sample constitutes | 4 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Luis | Last name of sampler or witnessed by | Mcrisal |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CMC Rebar Barsplice | Transportation Laboratory (TL) Number | C2108-E |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Service | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | CMC Rebar |
| Coupler Manufacturer | BarSplice | Intermediate Assembler or Fabricator | |
| Rebar Size | #7 | Coupler Model | Zap Screwlok |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | MM20104041 | Rebar Heat Number(s) | 4110469 |
| Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2021-10-13-25
DIME Test ID: 2021-10-13-25-4
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2021-10-18
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: bewing
Date of test: 10/18/2021
UTM: 400kip
Temperature: 72.00 f
Halo ID:
| Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 3 | No. 7/22mm | 1 | 0 | 0.6 | 57674 | 96123 | Service Splice | bewing |
General comments (publicly viewable) (Max 1000 characters): Service Splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 10/18/2021 ✔
