Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2021-10-13-25

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 215188
DEA: 080F5434
EFIS: 0817000239
Permit Numbers: 0823NMC0369
DIST-CO-RTE-PM08-RIV-I-15,SR-91-6.1-7.6
Award Date03/11/2020
Closeout Date06/05/2024
Work DescriptionI-15 ELC: 15/91 Express Lanes Connector Project (ELC)
Location DescriptionJunction of I-15 and SR-91 in Corona, CA
QA Service Level1 (Verified on 09/16/2020)

Sample Information

Sample Taken Date10/13/2021 Sample Unique Key25
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/15/2021
Sample typeQuality Assurance A brief description of the sampleBarsplice Zap Screwlok Coupler
The quantity of what the sample constitutes4 From where was the sample collectedJob Site
First name of sampler or witnessed byLuis Last name of sampler or witnessed byMcrisal
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCMC Rebar Barsplice Transportation Laboratory (TL) NumberC2108-E
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC Rebar
Coupler ManufacturerBarSplice Intermediate Assembler or Fabricator
Rebar Size#7 Coupler ModelZap Screwlok
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)MM20104041 Rebar Heat Number(s)4110469
Rebar Size 2 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2021-10-13-25-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory10/18/2021bewing
Yes
10/18/2021Service Splice
2021-10-13-25-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory10/18/2021bewing
Yes
10/18/2021Service Splice
2021-10-13-25-4CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)bewing, CT HQ - Sacramento Structural Materials Testing Laboratory10/18/2021bewing
Yes
10/18/2021Service Splice

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-10-13-25-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-10-13-25-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-10-13-25-4 CTM 670-December 2013 (Verified)