Summary for Test 2021-09-25-8-1

Test performed: AASHTO T308-10

Project Information

Project IdentifiersProject ID: 212112
DEA: 080C2514
EFIS: 0816000076
COOP: 081645
DIST-CO-RTE-PM08-SBD-10-0.0/13.2
Award Date06/06/2018
Closeout DateNot set
Work DescriptionDesign-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes
Location DescriptionLA/SBD County Line to PM 13.2 near I-15
QA Service Level1 (Verified on 10/16/2019)

Sample Information

Sample Taken Date09/25/2021 Sample Unique Key8
Date that the sample was received by the laboratory/organization performing the testing10/07/2021 Sample typeDepartment Acceptance
A brief description of the sample3/4" HMA-A-SP R15 0.5% LAS The quantity of what the sample constitutes1 Box HMA 98.76 tons out
From where was the sample collectedManufacturer First name of sampler or witnessed byVic
Last name of sampler or witnessed byTe Title of sampler
Telephone number of sampler Laboratory sample identification0577A-21
Linked DIME Sample ID The fabricator/manufacturer/facility nameVulcan Corona
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeHot Mix Asphalt HMA TypeType A HMA
HMA Grading3/4 inch Lot number
Sublot number HMA Mix NumberNot set
Binder content (%)Not set Virgin binder PGNot set
Design binder PGNot set Binder SupplierNot set
RAP content (%)Not set WMA AdditivesNot set
Antistrip typeNot set

Test Details

DIME Sample ID: 2021-09-25-8
DIME Test ID: 2021-09-25-8-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2021-10-12

Test Results


What temperature unit is used?: Fahrenheit
Input Type: Calculated
Tester's full name: Vincent Onoh
Date of test: 10/09/2021
Test procedure used?: no data
Mass of HMA Sample prior to ignition: no data
Mass Loss: no data
Correction Factor (Percent by mass of HMA Specimen): no data %
Moisture Content: no data
Temperature Compensation Factor: no data
Test Temperature: no data
Corrected Asphalt Binder Content: 5.06 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 10/12/2021