Summary for Test 2021-08-20-60-1
Test performed: AASHTO T30-19Project Information
| Project Identifiers | Project ID: 214114 DEA: 040A5394 EFIS: 0418000244 |
|---|---|
| DIST-CO-RTE-PM | 04-SOL-80,12-11.4/12.8, 2.1/2.8 |
| Award Date | Not set |
| Closeout Date | 02/24/2023 |
| Work Description | Widen EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc. |
| Location Description | I-80/I-680/Route 12 Interchange |
| QA Service Level | 1 (Verified on 04/23/2019) |
Sample Information
| Sample Taken Date | 08/20/2021 | Sample Unique Key | 60 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/08/2021 |
| Sample type | Verification | A brief description of the sample | 2 bags samples |
| The quantity of what the sample constitutes | 2 bags | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | Nick | Last name of sampler or witnessed by | Hall |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Syar Industries | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Syar Vallejo |
|---|---|---|---|
| Aggregate Size | Aggregate Source | ||
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number | Not set |
Test Details
DIME Sample ID: 2021-08-20-60
DIME Test ID: 2021-08-20-60-1
Testing Lab: CT D04 - Hayward DME / District Laboratory
Test Method: AASHTO T30-19: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2021-10-06
Test Results
Does this test use 1/4 sieve?: No
Is an aggregate correction factor used?: No
Input Type: Calculated
Tester's full name: David Ordez
Date of test: 09/08/2021
| Cumulative Percent Passing | ||||||
|---|---|---|---|---|---|---|
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 100 % | ||||||
| 98.9 % | ||||||
| 72.7 % | ||||||
| 51.4 % | ||||||
| 38 % | ||||||
| 29.1 % | ||||||
| 21.6 % | ||||||
| 14 % | ||||||
| 10.2 % | ||||||
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 10/6/2021 ✔
