Sample Record
Owner Lab
- CT D04 - DME / District Lab
DIME Sample ID 2021-08-20-60
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 214114 DEA: 040A5394 EFIS: 0418000244 |
---|---|
DIST-CO-RTE-PM | 04-SOL-80,12-11.4/12.8, 2.1/2.8 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Widen EB SR-12 Connector, Construct 3 ramps & 2 box girder bridges, remove existing bridge, etc. |
Location Description | I-80/I-680/Route 12 Interchange |
QA Service Level | 1 (Verified on 04/23/2019) |
Sample Information
Sample Taken Date | 08/20/2021 | Sample Unique Key | 60 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/08/2021 |
Sample type | Verification | A brief description of the sample | 2 bags samples |
The quantity of what the sample constitutes | 2 bags | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | Nick | Last name of sampler or witnessed by | Hall |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Syar Industries | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | Syar Vallejo |
---|---|---|---|
Aggregate Size | Aggregate Source | ||
RAP Stockpile | Stockpile Size (tons) | ||
JMF Verification ID | JMF3513-2021-81 |