Summary for Test 2021-04-28-37-3

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 213653
DEA: 044G8204
EFIS: 0413000049
DIST-CO-RTE-PM04-MRN-101-10.6/10.8
Award Date05/05/2020
Closeout Date08/14/2023
Work DescriptionREPLACE SAN RAFAEL HARBOR BRIDGE (ABC)
Location DescriptionMARIN COUTY, IN SAN RAFAEL, FROM ROUTE 101 NORTHBOUND OFF-RAMP TO 2ND STREET
QA Service Level1 (Verified on 05/31/2019)

Sample Information

Sample Taken Date04/28/2021 Sample Unique Key37
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing04/28/2021
Sample typeQuality Control A brief description of the samplePortland Cement Concrete
The quantity of what the sample constitutes100 CY From where was the sample collectedJob Site
First name of sampler or witnessed byPedro Last name of sampler or witnessed byDe Haro
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameShamrock Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design number3172SFA
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected194524
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedTemporary Abutment 2 Beck Wall Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2021-04-28-37
DIME Test ID: 2021-04-28-37-3
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2021-08-16

Test Results


Input Type: Calculated
Tester's full name: Pedro De Haro
Date of test: 04/28/2021
Air Content: 5.5 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 8/16/2021