Summary for Test 2021-04-28-37-3
Test performed: CTM 504-June 2010Project Information
| Project Identifiers | Project ID: 213653 DEA: 044G8204 EFIS: 0413000049 |
|---|---|
| DIST-CO-RTE-PM | 04-MRN-101-10.6/10.8 |
| Award Date | 05/05/2020 |
| Closeout Date | 08/14/2023 |
| Work Description | REPLACE SAN RAFAEL HARBOR BRIDGE (ABC) |
| Location Description | MARIN COUTY, IN SAN RAFAEL, FROM ROUTE 101 NORTHBOUND OFF-RAMP TO 2ND STREET |
| QA Service Level | 1 (Verified on 05/31/2019) |
Sample Information
| Sample Taken Date | 04/28/2021 | Sample Unique Key | 37 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 04/28/2021 |
| Sample type | Quality Control | A brief description of the sample | Portland Cement Concrete |
| The quantity of what the sample constitutes | 100 CY | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Pedro | Last name of sampler or witnessed by | De Haro |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Shamrock | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 3172SFA |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 194524 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Temporary Abutment 2 Beck Wall | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2021-04-28-37
DIME Test ID: 2021-04-28-37-3
Testing Lab: RMA Group - Rancho Cordova
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2021-08-16
Test Results
Input Type: Calculated
Tester's full name: Pedro De Haro
Date of test: 04/28/2021
Air Content: 5.5 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/16/2021 ✔
