Summary for Test 2021-06-23-27-5

Test performed: AASHTO T176-08

Project Information

Project IdentifiersProject ID: 214131
DEA: 080N69U4
EFIS: 0812000307
COOP: 081635
DIST-CO-RTE-PM08-RIV-60-22.1/22.6
Award Date05/01/2019
Closeout DateNot set
Work DescriptionImproving Operation efficiency and traffic flow in the SR-60 Truck Corridor in Moreno Valley. Widening inside and outside shoulders in 6 stages.
Location DescriptionR-60 Truck Climbing Lane . Construction of new east and west bound truck lanes from Gilman Springs road to 1.37 miles west if Jack Rabbit trail. Existing shoulders will be widened to standard 10 ft inside and 12 ft outside respectively.
QA Service Level2 (Verified on 04/30/2019)

Sample Information

Sample Taken Date06/23/2021 Sample Unique Key27
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/12/2021
Sample typeVerification A brief description of the sampleJMF 3/4" HMA-A-SP R15 No LAS
The quantity of what the sample constitutes5 Bags of Coldfeed, 3 Bags of RAP From where was the sample collectedManufacturer
First name of sampler or witnessed byRMA Last name of sampler or witnessed byGroup
Title of sampler Telephone number of sampler
Laboratory sample identification0406A-21 Linked DIME Sample ID
The fabricator/manufacturer/facility nameAll American Asphalt - Perris Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-33-0005
The fabricator's/manufacturer's product name for the sample3/4 HMA-A-SP R15 The fabricator/manufacturer designation for the sample
The plant number105927 A detailed description of where the material sample was collectedBelt Cut at All American Perris Plant
Where the material sample would have been placed if not sampledAsphalt Paving Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2021-06-23-27
DIME Test ID: 2021-06-23-27-5
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T176-08: Standard Method of Test for Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test (Sand Equivalent)
Test Release Date: 2021-07-23

Test Results


How many times will the test be run?: 3 Times
Input Type: Measured
Tester's full name: Larry Diaz
Date of test: 07/16/2021
Clay Level (Test 1): 5.2
Sand Level (Test 1): 3.7
Clay Level (Test 2): 5.6
Sand Level (Test 2): 4
Clay Level (Test 3): 5.3
Sand Level (Test 3): 3.7
Sand Equivalent (Test 1): 72
Sand Equivalent (Test 2): 72
Sand Equivalent (Test 3): 70
Sand Equivalent: 72
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/23/2021