Summary for Test 2021-06-28-5-3
Test performed: CTM 670-December 2013Project Information
| Project Identifiers | Project ID: 214702 DEA: 030F2864 EFIS: 0320000123 |
|---|---|
| DIST-CO-RTE-PM | 03-SAC-99-7.92 / 8.4 |
| Award Date | 06/24/2020 |
| Closeout Date | 11/28/2023 |
| Work Description | Remove and replace Consumnes River and Consumnes River Overflow bridge |
| Location Description | Sacramento County |
| QA Service Level | 1 (Verified on 04/20/2020) |
Sample Information
| Sample Taken Date | 06/28/2021 | Sample Unique Key | 5 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/29/2021 |
| Sample type | Quality Assurance | A brief description of the sample | #10 HRC 500/510 Couplers |
| The quantity of what the sample constitutes | 150 Couplers | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Thien | Last name of sampler or witnessed by | n/a |
| Title of sampler | ASR | Telephone number of sampler | |
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CMC | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | SMTL TM5 - Couplers | Production or Authorization Testing | Production Testing |
|---|---|---|---|
| Service or Ultimate | Ultimate | Material Standard Code | ASTM A706 |
| Material Grade | 60 | Rebar Manufacturer | CMC |
| Coupler Manufacturer | HRC | Intermediate Assembler or Fabricator | |
| Rebar Size | #10 | Coupler Model | 500/510 |
| Coating Standards | Uncoated | Shape of Rebar | Straight |
| Rebar Hoop Diameter | Rebar Hoop Fabricator | ||
| Coupler Component Heat/Lot Number(s) | 75070365 73118000 | Rebar Heat Number(s) | 3101756 |
| Rebar Size 2 | Coupler Unique ID | Not set |
Test Details
DIME Sample ID: 2021-06-28-5
DIME Test ID: 2021-06-28-5-3
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2021-06-29
Test Results
Number of Samples Tested: 1
Input Type: Measured
Tester's full name: spaine
Date of test: 06/29/2021
UTM: 2000kip
Temperature: 72.00 f
Halo ID:
| Num | Sample | Number of Cycles | Size | Mfg. Lot Number(s) | Slip (inch) | Area (sqin) | Peak Load (lbf) | Peak Stress (psi) | Comments | Tested By |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | 3 | No. 10/32mm | 1 | 0 | 1.27 | 117253 | 92325 | ok necking | spaine |
General comments (publicly viewable) (Max 1000 characters): ok necking
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.
Test was verified on 6/29/2021 ✔
