Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2021-06-28-5

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 214702
DEA: 030F2864
EFIS: 0320000123
DIST-CO-RTE-PM03-SAC-99-7.92 / 8.4
Award Date06/24/2020
Closeout Date11/28/2023
Work DescriptionRemove and replace Consumnes River and Consumnes River Overflow bridge
Location DescriptionSacramento County
QA Service Level1 (Verified on 04/20/2020)

Sample Information

Sample Taken Date06/28/2021 Sample Unique Key5
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/29/2021
Sample typeQuality Assurance A brief description of the sample#10 HRC 500/510 Couplers
The quantity of what the sample constitutes150 Couplers From where was the sample collectedJob Site
First name of sampler or witnessed byThien Last name of sampler or witnessed byn/a
Title of samplerASR Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCMC Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC
Coupler ManufacturerHRC Intermediate Assembler or Fabricator
Rebar Size#10 Coupler Model500/510
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)75070365 73118000 Rebar Heat Number(s)3101756
Rebar Size 2 Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2021-06-28-5-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory06/29/2021spaine
Yes
06/29/2021ok necking
2021-06-28-5-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory06/29/2021spaine
Yes
06/29/2021ok necking
2021-06-28-5-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)spaine, CT HQ - Sacramento Structural Materials Testing Laboratory06/29/2021spaine
Yes
06/29/2021ok necking

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2021-06-28-5-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-06-28-5-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2021-06-28-5-3 CTM 670-December 2013 (Verified)