Summary for Test 2021-06-17-25-1

Test performed: CTM 670-December 2013

Project Information

Project IdentifiersProject ID: 214355
DEA: 120K0214
EFIS: 1214000096
DIST-CO-RTE-PM12-ORA-5-12.4/14.5
Award Date12/20/2019
Closeout Date10/02/2025
Work DescriptionSouth County Improvement Project (Phase 1 - Avery/Crown Valley) PLACE HMA, INSTALL CONC PAVEMENT, RETAIN WALL, MODIFY ELECT SYS. | Add one lane btwn 73 & Oso PKWY
Location DescriptionORANGE COUNTY IN SAN JUAN CAPISTRANO, LAGUNA HILLS, LAGUNA NIGUEL AND MISSION VIEJO FROM 0.5 MILE SOUTH OF AVERY PARKWAY UNDERCROSSING TO 0.8 MILE NORTH OF CROWN VALLEY PARKWAY OVERCROSSING
QA Service Level1 (Verified on 10/31/2019)

Sample Information

Sample Taken Date06/17/2021 Sample Unique Key25
Date that the sample was received by the laboratory/organization performing the testing06/22/2021 Sample typeQuality Assurance
A brief description of the sampleDayton Bar lock couplers The quantity of what the sample constitutes4
From where was the sample collectedJob Site First name of sampler or witnessed byJared
Last name of sampler or witnessed byRamsey Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameDayton Integrity
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerIntegrity Rebar
Coupler ManufacturerDayton Superior Intermediate Assembler or Fabricator
Rebar Size#11 Coupler Model Bar Lock Standard Couplers
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)MM20105026 Rebar Heat Number(s)3101750
Rebar Size 2 Coupler Unique IDNot set

Test Details

DIME Sample ID: 2021-06-17-25
DIME Test ID: 2021-06-17-25-1
Testing Lab: CT HQ - Sacramento Structural Materials Testing Laboratory
Test Method: CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)
Test Release Date: 2021-06-23

Test Results


Number of Samples Tested: 1
Input Type: Measured
Tester's full name: spaine
Date of test: 06/23/2021
UTM: 2000kip
Temperature: 72.00 f
Halo ID: Small
NumSampleNumber of CyclesSizeMfg. Lot Number(s)Slip (inch)Area (sqin)Peak Load (lbf)Peak Stress (psi)CommentsTested By
11No. 11/36mm101.5613336285488service splicespaine

General comments (publicly viewable) (Max 1000 characters): service splice
Test Graph
Source: Bluehill Data Point File
WARNING: position or load not found in data points imported from Instron machine.

Test was verified on 6/23/2021