Summary for Test 2021-05-14-8-10
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 213707 DEA: 081C38U4 EFIS: 0817000196 |
---|---|
DIST-CO-RTE-PM | 08-RIV-10-6.7/R25.1 |
Award Date | 11/26/2019 |
Closeout Date | 11/01/2023 |
Work Description | Remove concrete pavement and base, and place HMA and JPCP |
Location Description | ROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON. |
QA Service Level | 1 (Verified on 01/09/2020) |
Sample Information
Sample Taken Date | 05/14/2021 | Sample Unique Key | 8 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/18/2021 |
Sample type | Verification | A brief description of the sample | PSUE 3/4" HMA-A-SP R24 0.5% LAS |
The quantity of what the sample constitutes | 6 Bags Agg., 2 Bags Rap | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Kevin | Last name of sampler or witnessed by | Oluoha |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0284A-21 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | California Commercial Asphalt - Coachella | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0084 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | 3/4 HMA-A-SP R24 | The fabricator/manufacturer designation for the sample | |
The plant number | 43417615 | A detailed description of where the material sample was collected | Belt Cut at California Commercial Asphalt Coachella Plant |
Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 3/4 inch |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2021-05-14-8
DIME Test ID: 2021-05-14-8-10
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-05-26
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Satish Jain
Date of test: 05/21/2021
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 96 %
Cumulative percent passing the 1/2 in. sieve: 83 %
Cumulative percent passing the 3/8 in. sieve: 72 %
Cumulative percent passing the #4 sieve: 46 %
Cumulative percent passing the #8 sieve: 35 %
Cumulative percent passing the #16 sieve: 25 %
Cumulative percent passing the #30 sieve: 17 %
Cumulative percent passing the #50 sieve: 11 %
Cumulative percent passing the #100 sieve: 8 %
Cumulative percent passing the #200 sieve: 4.5 %
General comments (publicly viewable) (Max 1000 characters): Combined RAP/Virgin Aggregate Gradation W/Correlation Factors Applied
Test was verified on 5/26/2021 ✔