Summary for Test 2021-02-11-11-9
Test performed: CTM 202-November 2011Project Information
Project Identifiers | Project ID: 214355 DEA: 120K0214 EFIS: 1214000096 |
---|---|
DIST-CO-RTE-PM | 12-ORA-5-12.4/14.5 |
Award Date | 12/20/2019 |
Closeout Date | Not set |
Work Description | South County Improvement Project (Phase 1 - Avery/Crown Valley) PLACE HMA, INSTALL CONC PAVEMENT, RETAIN WALL, MODIFY ELECT SYS. | Add one lane btwn 73 & Oso PKWY |
Location Description | ORANGE COUNTY IN SAN JUAN CAPISTRANO, LAGUNA HILLS, LAGUNA NIGUEL AND MISSION VIEJO FROM 0.5 MILE SOUTH OF AVERY PARKWAY UNDERCROSSING TO 0.8 MILE NORTH OF CROWN VALLEY PARKWAY OVERCROSSING |
QA Service Level | 1 (Verified on 10/31/2019) |
Sample Information
Sample Taken Date | 02/11/2021 | Sample Unique Key | 11 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/19/2021 |
Sample type | Verification | A brief description of the sample | JMF 3/4" HMA-A-SP R15 NO LAS |
The quantity of what the sample constitutes | 4 Bag of Coldfeed, 4 Bags of RAP | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | All American Asphalt | Last name of sampler or witnessed by | QC |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | 0149A-21 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | All American Asphalt Irvine | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-33-0005 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | 3/4 HMA-A-SP R15 | The fabricator/manufacturer designation for the sample | |
The plant number | 105793 | A detailed description of where the material sample was collected | Belt Cut at All American Irvine Plant |
Where the material sample would have been placed if not sampled | Asphalt Paving | Primary Aggregate Nominal Size | 3/4 inch |
The concrete mix design number | Lot number | ||
Sublot number | Aggregate Mix Number | Not set |
Test Details
DIME Sample ID: 2021-02-11-11
DIME Test ID: 2021-02-11-11-9
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2021-03-02
Test Results
What size aggregate is being tested?: Combined Gradation
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Larry Diaz
Date of test: 02/24/2021
Cumulative percent passing the 3 in. sieve: 100 %
Cumulative percent passing the 2 1/2 in. sieve: 100 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 96 %
Cumulative percent passing the 3/8 in. sieve: 87 %
Cumulative percent passing the #4 sieve: 59 %
Cumulative percent passing the #8 sieve: 41 %
Cumulative percent passing the #16 sieve: 31 %
Cumulative percent passing the #30 sieve: 23 %
Cumulative percent passing the #50 sieve: 17 %
Cumulative percent passing the #100 sieve: 11 %
Cumulative percent passing the #200 sieve: 8 %
General comments (publicly viewable) (Max 1000 characters): RAP Aggregate Gradation After Ignition Oven
Test was verified on 3/2/2021 ✔