Summary for Test 2021-01-18-5-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 212112
DEA: 080C2514
EFIS: 0816000076
COOP: 081645
DIST-CO-RTE-PM08-SBD-10-0.0/13.2
Award Date06/06/2018
Closeout DateNot set
Work DescriptionDesign-Build of I-10 Corridor Contract 1 - Adding 2 new Express Lanes
Location DescriptionLA/SBD County Line to PM 13.2 near I-15
QA Service Level1 (Verified on 10/16/2019)

Sample Information

Sample Taken Date01/18/2021 Sample Unique Key5
Date that the sample was received by the laboratory/organization performing the testing01/19/2021 Sample typeQuality Assurance
A brief description of the samplebearing pad The quantity of what the sample constitutes1
From where was the sample collectedManufacturer First name of sampler or witnessed byBrad
Last name of sampler or witnessed byStreeter Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameScougal Rubber
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)19414-8R
Material/Compound/Elastomer IDna Samples Representing29
Description (size)4.6"x18"x18" Comments
Description (Number of Shims)8 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Scougal Rubber
Batch Numberna

Test Details

DIME Sample ID: 2021-01-18-5
DIME Test ID: 2021-01-18-5-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2021-01-22

Test Results


Input Type: Measured
Tester's full name: Richard Wilmshurst
Date of test: 01/22/2021
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 1/22/2021