Summary for Test 2019-05-13-16-6

Test performed: CTM 204-June 2010

Project Information

Project IdentifiersProject ID: 214175
DEA: 030H4804
EFIS: 0315000198
DIST-CO-RTE-PM03-SAC-99-0.1/1.6,11.8/21.6
Award Date08/20/2019
Closeout Date08/11/2023
Work DescriptionCOLD PLANE AC PAVEMENT AND RHMA OVERLAY.
Location DescriptionSACRAMENTO COUNTY IN AND NEAR GALT FROM DRY CREEK BRIDGE TO SIMMERHORN ROAD AND IN ELK GROVE AND SACRAMENTO FROM 0.9 MILE SOUTH OF ELK GROVE BOULEVARD TO MARTIN LUTHER KING JR BOULEVARD
QA Service Level1 (Verified on 05/29/2019)

Sample Information

Sample Taken Date05/13/2019 Sample Unique Key16
Date that the sample was received by the laboratory/organization performing the testing05/14/2020 Sample typeVerification
A brief description of the sample3/4" HMA - A The quantity of what the sample constitutesJMF Verification
From where was the sample collectedManufacturer First name of sampler or witnessed byJ.
Last name of sampler or witnessed byKort (WITNESS) Title of sampler
Telephone number of sampler Laboratory sample identificationJMF20-013
Linked DIME Sample ID The fabricator/manufacturer/facility nameGeorge Reed - Clements Plant
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-03-0020::JACKSON VALLEY QUARRY
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedHot Drop at the Plant
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2019-05-13-16
DIME Test ID: 2019-05-13-16-6
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: CTM 204-June 2010: Method of Test for Liquid Limit, Plastic Limit and Plasticity Index of Soils (Plasticity Index)
Test Release Date: 2021-01-21

Test Results


The test method used?: Plastic Index
Input Type: Calculated
Tester's full name: D-10 Lab Personnel
Date of test: 05/16/2019
Liquid Limit (LL): 0 %
Plastic Limit (PL): 0 %
Plastic Index(PI): NP
General comments (publicly viewable) (Max 1000 characters): JMF20-013. Test date is estimated, based on a completed CEM-3513 form from D-10.

Test was verified on 1/21/2021 ✔