Project Details

This page displays current information for project DEA: 030H4804.

Project Information

Project IdentifiersProject ID: 214175
DEA: 030H4804
EFIS: 0315000198
DIST-CO-RTE-PM03-SAC-99-0.1/1.6,11.8/21.6
Award Date08/20/2019
Closeout Date08/11/2023
Work DescriptionCOLD PLANE AC PAVEMENT AND RHMA OVERLAY.
Location DescriptionSACRAMENTO COUNTY IN AND NEAR GALT FROM DRY CREEK BRIDGE TO SIMMERHORN ROAD AND IN ELK GROVE AND SACRAMENTO FROM 0.9 MILE SOUTH OF ELK GROVE BOULEVARD TO MARTIN LUTHER KING JR BOULEVARD
QA Service Level1 (Verified on 05/29/2019)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
sushma.lee@dot.ca.govSushma LeeResident EngineerCaltrans RE DB
kim.noonan@dot.ca.govKim NoonanStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 1-10 of 102 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2021-08-19-108/19/202108/24/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-08-19-208/19/202108/24/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-08-19-308/19/202108/24/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-08-19-408/19/202108/24/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-08-16-108/16/202108/20/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-08-16-208/16/202108/20/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-08-16-308/16/202108/20/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-08-16-408/16/202108/20/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-08-16-508/16/202108/20/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-07-21-2307/21/202107/26/2021AcceptanceAsphalt Rubber BinderView

Job Mix Formula (JMF)

JMFs associated with this project.

Displaying 1-2 of 2 results.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
JMF3511-23-2021-5Submittal Accepted for Verification CT D03 - Olivehurst Northern Regional Laboratory01/20/2021View
JMF3511-23-2020-288Submittal Accepted for Verification CT D03 - Olivehurst Northern Regional Laboratory09/18/2020View

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods