Summary for Test 2021-01-18-4-5

Test performed: CTM 556-January 2018

Project Information

Project IdentifiersProject ID: 213750
DEA: 120K0224
EFIS: 1214000097
DIST-CO-RTE-PM12-ORA-5-14.5/17.1
Award Date03/05/2019
Closeout Date03/13/2025
Work DescriptionSouth County Improvement Project (Phase 2 - Oso/Alicia) CONST BRIDGES, RW, SW, HMA PVMT, JPCP, DRAINAGE, AND ELECT SYSTEMS.
Location DescriptionORANGE COUNTY IN MISSION VIEJO AND LAGUNA HILLS FROM 0.7 MILE SOUTH OF OSO PARKWAY OVERCROSSING TO 0.3 MILE SOUTH OF ALICIA PARKWAY OVERCROSSING
QA Service Level1 (Verified on 04/15/2019)

Sample Information

Sample Taken Date01/18/2021 Sample Unique Key4
Date that the sample was received by the laboratory/organization performing the testing01/19/2021 Sample typeQuality Control
A brief description of the sampleMix Design 312 The quantity of what the sample constitutes20 cy
From where was the sample collectedJob Site First name of sampler or witnessed byFrancisco
Last name of sampler or witnessed byLopez Title of samplerQ C Supervisor
Telephone number of sampler Laboratory sample identification008
Linked DIME Sample ID The fabricator/manufacturer/facility nameCoreslab Structures L A Inc
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure nameOso Parkway Route 5
Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number312
The truck number from where the sample was collectedTruck 2 Batch 4 5 6 The batch plant ticket number from where the sample was collected77246 77247 77248
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBed 9 from front discharge RMT into wheelbarrow Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2021-01-18-4
DIME Test ID: 2021-01-18-4-5
Testing Lab: Coreslab
Test Method: CTM 556-January 2018: Method of Test for Slump of Fresh Portland Cement Concrete
Test Release Date: 2021-01-20

Test Results


Input Type: Calculated
Tester's full name: Francisco Lopez
Date of test: 01/18/2021
Slump: 24.5 inch
General comments (publicly viewable) (Max 1000 characters): VSI 1

Test was verified on 1/20/2021 ✔