Summary for Test 2020-12-04-13-7
Test performed: CTM 523-July 2012Project Information
| Project Identifiers | Project ID: 213707 DEA: 081C38U4 EFIS: 0817000196 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-10-6.7/R25.1 |
| Award Date | 11/26/2019 |
| Closeout Date | 11/01/2023 |
| Work Description | Remove concrete pavement and base, and place HMA and JPCP |
| Location Description | ROUTE 10/60 SEPARATION IN BEAUMONT TO ROUTE 10/111 SEPARATION NEAR CABAZON. |
| QA Service Level | 1 (Verified on 01/09/2020) |
Sample Information
| Sample Taken Date | 12/04/2020 | Sample Unique Key | 13 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 12/05/2020 | Sample type | Quality Assurance |
| A brief description of the sample | JPCP beams | The quantity of what the sample constitutes | 4 Beams |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Alexsey, Kennedy |
| Last name of sampler or witnessed by | Souglobov, Eubany | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | 35JA1, 35JA2, 35JB1, 35JB2 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Coffman Specialties, Inc | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 1906-2 |
|---|---|---|---|
| The truck number from where the sample was collected | Unknown | The batch plant ticket number from where the sample was collected | tt |
| Concrete batch plant | Unknown | The fabricator/manufacturer designation for the sample | Unknown |
| A detailed description of where the material sample was collected | Discharge from concrete truck into wheelbarrow | Where the material sample would have been placed if not sampled | Unknown |
| From Lot No. | Unknown | Bag Lot No. | Unknown |
Test Details
DIME Sample ID: 2020-12-04-13
DIME Test ID: 2020-12-04-13-7
Testing Lab: CT D08 - Fontana Field Testing Laboratory
Test Method: CTM 523-July 2012: Method of Test for Flexural Strength of Concrete
Test Release Date: 2021-01-06
Test Results
What test method is being used?: Third-Point Loading
Fracture initiates in the tension surface: Within the Middle Third of the Span Length
Lab procedure used: Method B
Input Type: Calculated
Tester's full name: k. Talati, M. Warde
Date of test: 01/05/2021
Identification number: 35JB2
Width of specimen: 6.0625 inch
Depth of specimen: 6.0625 inch
Span length of specimen: 18 inch
Maximum load applied: 7155 lb
Curing history and apparent moisture condition of the specimen: Sand pit
If specimen was capped, ground or if leather shims were used: No
Defects in specimen: None
Age of specimen: 32 days
Modulus of rupture: 610 psi
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 1/6/2021 ✔