Summary for Test 2020-03-02-25-6

Test performed: CTM 204-June 2010

Project Information

Project IdentifiersProject ID: 213411
DEA: 030H10U4
EFIS: 0317000246
DIST-CO-RTE-PM03-SAC-5-9.7/24.9
Award Date05/01/2019
Closeout Date02/22/2024
Work DescriptionNot set
Location DescriptionConstruction on state highway in Sacramento County in and near Sacramento from 1.1 miles south of Elk Grove Boulevard to American River Viaduct
QA Service Level1 (Verified on 07/19/2019)

Sample Information

Sample Taken Date03/02/2020 Sample Unique Key25
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/03/2021
Sample typeVerification A brief description of the sample3/4" HMA - A w/RAP (Long Life, RB)
The quantity of what the sample constitutesJMF Verification From where was the sample collectedManufacturer
First name of sampler or witnessed byWalt Last name of sampler or witnessed byWylie (WITNESS)
Title of samplerGranite Personnel Telephone number of sampler
Laboratory sample identificationJMF20-002 Linked DIME Sample ID
The fabricator/manufacturer/facility nameGranite Construction Company - Bradshaw Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-34-0060::VINEYARD SOUTH
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedCold Feed
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix NumberNot set

Test Details

DIME Sample ID: 2020-03-02-25
DIME Test ID: 2020-03-02-25-6
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: CTM 204-June 2010: Method of Test for Liquid Limit, Plastic Limit and Plasticity Index of Soils (Plasticity Index)
Test Release Date: 2021-01-05

Test Results


The test method used?: Plastic Index
Input Type: Calculated
Tester's full name: Thom Stinnett
Date of test: 03/12/2020
Liquid Limit (LL): 0 %
Plastic Limit (PL): 0 %
Plastic Index(PI): NP
General comments (publicly viewable) (Max 1000 characters): JMF20-002. Test date estimated.

Test was verified on 1/5/2021