Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2016-10-31-5

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 210794
DEA: 062HT104
EFIS: 0612000287
DIST-CO-RTE-PM06-FRE-99-23.5/26.7
Award Date06/30/2016
Closeout Date09/16/2020
Work Description(Alternative Delivery) Realign Freeway CONTACT SMR PRIOR TO PERFORMING ANY TESTING OR INSPECTION. CMGC PROJECT. Realign Route 99 between Ashlan Avenue and Olive Avenue to accommodate the High Speed Train (HST).
Location DescriptionState Highway 99 in Fresno (Fresno County) from 0.2 miles North of Olive Ave over-crossing to 0.2 miles North of Ashlan Ave over-crossing.
QA Service Level1 (Verified on 10/01/2015)

Sample Information

Sample Taken Date10/31/2016 Sample Unique Key5
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/04/2016
Sample typeQuality Assurance A brief description of the sampleGriptwist Couplers
The quantity of what the sample constitutes4 From where was the sample collectedJob Site
First name of sampler or witnessed byFares Last name of sampler or witnessed byThwabah
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identificationUnknown Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameBarSplice Gerdau Transportation Laboratory (TL) NumberC876708
Inspector Lot Number from the Transportation Laboratory (TL) FormNA Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingAuthorization Testing
Service or UltimateUltimate Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerGerdau
Coupler ManufacturerBarSplice Intermediate Assembler or FabricatorUnknown
Rebar Size10 Coupler ModelGripTwist
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop DiameterUnknown Rebar Hoop FabricatorUnknown
Coupler Component Heat/Lot Number(s)A162317 Rebar Heat Number(s)65024957 02
Rebar Size 2 Not set Coupler Unique IDNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2016-10-31-5-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)Brian, CT HQ - Sacramento Structural Materials Testing Laboratory12/01/2016Brian
Yes
12/01/2016necking okay
2016-10-31-5-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)Brian, CT HQ - Sacramento Structural Materials Testing Laboratory12/01/2016Brian
Yes
12/01/2016necking okay
2016-10-31-5-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile Slip)Brian, CT HQ - Sacramento Structural Materials Testing Laboratory12/01/2016Brian
Yes
12/01/2016necking okay

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2016-10-31-5-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2016-10-31-5-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2016-10-31-5-3 CTM 670-December 2013 (Verified)