Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2016-11-07-3

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 211391
DEA: 074T7104
EFIS: 0714000209
DIST-CO-RTE-PM07-LA-66-2.9
Award Date06/17/2016
Closeout Date07/05/2017
Work DescriptionINSTALL TRAFFIC AND PEDESTRIAN SIGNALS.
Location DescriptionLOS ANGELES COUNTY IN POMONA AT SUMNER AVENUE
QA Service Level1 (Verified on 06/06/2016)

Sample Information

Sample Taken Date11/07/2016 Sample Unique Key3
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/10/2016
Sample typeQuality Assurance A brief description of the sampleFlash Welded Rebar Hoops
The quantity of what the sample constitutes12 From where was the sample collectedFabricator
First name of sampler or witnessed byGary Last name of sampler or witnessed byMaComb
Title of samplerUnknown Telephone number of samplerUnknown
Laboratory sample identificationUnknown Linked DIME Sample IDUnknown
The fabricator/manufacturer/facility nameTNT Rebar Nucor Cascade Transportation Laboratory (TL) NumberC970389
Inspector Lot Number from the Transportation Laboratory (TL) FormL1013016 Structure unique identifierNot set
Structure nameNot set

Material Information

Material TypeSMTL TM5 - Welded Hoops Production or Authorization TestingProduction Testing
Service or UltimateUltimate Rebar Heat Number(s)PL16201954, 001916
Hoop Manufacturer Lot Number(s)1 Material Standard CodeASTM A706
Material Grade60 Rebar Size#4,5,5
Diameter of Hoop2'-2", 2'-8", 3'-2" Epoxy CoatedNo
Epoxy Coating ColorNA Rebar ManufacturerNucor Cascade
Welding CompanyTNT Rebar Coating StandardsUncoated
Weld TypeFlash Welded

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2016-11-07-3-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory11/16/2016Fred
Yes
11/16/2016Bar Broke; OK Necking
2016-11-07-3-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory11/16/2016Fred
Yes
11/16/2016Bar Broke; OK Necking
2016-11-07-3-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory11/16/2016Fred
Yes
11/16/2016Bar Broke; OK Necking
2016-11-07-3-4CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory11/16/2016Fred
Yes
11/16/2016Bar Broke in Heat Affected Area; OK Necking
2016-11-07-3-5CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory11/16/2016Fred
Yes
11/16/2016Bar Broke; OK Necking
2016-11-07-3-6CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory11/16/2016Fred
Yes
11/16/2016Bar Broke in Heat Affected Area; OK Necking; OK Necking
2016-11-07-3-7CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory11/16/2016Fred
Yes
11/16/2016Bar Broke in Heat Affected Area; OK Necking; OK Necking
2016-11-07-3-8CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory11/16/2016Fred
Yes
11/16/2016necking okay
2016-11-07-3-9CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory11/16/2016Fred
Yes
11/16/2016necking okay
2016-11-07-3-10CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Tensile)Fred, CT HQ - Sacramento Structural Materials Testing Laboratory11/16/2016Fred
Yes
11/16/2016Broke in Weld No Necking

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2016-11-07-3-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2016-11-07-3-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2016-11-07-3-3 CTM 670-December 2013 (Verified)
DIME Test ID: 2016-11-07-3-4 CTM 670-December 2013 (Verified)
DIME Test ID: 2016-11-07-3-5 CTM 670-December 2013 (Verified)
DIME Test ID: 2016-11-07-3-6 CTM 670-December 2013 (Verified)
DIME Test ID: 2016-11-07-3-7 CTM 670-December 2013 (Verified)
DIME Test ID: 2016-11-07-3-8 CTM 670-December 2013 (Verified)
DIME Test ID: 2016-11-07-3-9 CTM 670-December 2013 (Verified)
DIME Test ID: 2016-11-07-3-10 CTM 670-December 2013 (Verified)
DIME Test ID: 2016-11-07-3-11 CTM 670-December 2013 (Verified)