Sample Record
Owner Lab
- CT D04 - Richmond Field Laboratory
DIME Sample ID 2024-03-05-45
Project Information
Project Identifiers | Project ID: 994803 DEA: 043J0704 EFIS: 0415000077 |
---|---|
DIST-CO-RTE-PM | 04-CC-80-10.1/13.5 |
Award Date | 03/10/2023 |
Closeout Date | Not set |
Work Description | Remove PCC and AC, place PCP and AC Resurfacing. |
Location Description | Construction on State Highway in Contra Costa County in Hercules and Crockett from Route 80/4 separation to 0.1 mile west of Crockett Viaduct. |
QA Service Level | 1 (Verified on 05/10/2023) |
Sample Information
Sample Taken Date | 03/05/2024 | Sample Unique Key | 45 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 03/05/2024 |
Sample type | Quality Assurance | A brief description of the sample | 1INCH x No.4 PCC |
The quantity of what the sample constitutes | 2 bags | From where was the sample collected | Fabricator |
First name of sampler or witnessed by | IGNACIO | Last name of sampler or witnessed by | ARECHIGA |
Title of sampler | Lab Technician | Telephone number of sampler | 5102077252 |
Laboratory sample identification | Rich_24_014 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Vanguard Mobile San Pablo Plant | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name | Barrier |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-48-0002 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Stockpile @ Plant | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
The concrete mix design number | 590 MAC | Lot number | |
Sublot number | Aggregate Mix Number | 590 MAC |
Submitted Tests
DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
---|---|---|---|---|---|---|---|---|
No results found. |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |