Sample Record
Owner Lab
- CT D04 - Petaluma Field Laboratory
DIME Sample ID 2023-05-24-96
Project Information
Project Identifiers | Project ID: 993333 DEA: 04264724 EFIS: 0419000068 |
---|---|
DIST-CO-RTE-PM | 04-MRN-101-R20.8/27.1 |
Award Date | 04/26/2022 |
Closeout Date | Not set |
Work Description | CIP BRIDGES, CONSTRUCT ROADWAY, RETAINING WALLS AND MODIFY ELECTRICAL. |
Location Description | MARIN COUNTY IN AND NEAR NOVATO FROM 0.1 MILE SOUTH OF FRANKLIN AVENUE OVERHEAD TO 0.5 MILE SOUTH OF SAN ANTONIO CREEK BRIDGE |
QA Service Level | 1 (Verified on 11/01/2021) |
Sample Information
Sample Taken Date | 05/24/2023 | Sample Unique Key | 96 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/25/2023 |
Sample type | Quality Assurance | A brief description of the sample | 3/4 HMA-SP Type A |
The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | Anthony | Last name of sampler or witnessed by | Valdez |
Title of sampler | Telephone number of sampler | ||
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Dutra Materials Richmond | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | 5 |
Sublot number | 7 | HMA Mix Number |
Submitted Tests
Test File Attachments
DIME Test ID: 2023-05-24-96-1 AASHTO T308-10 (Verified)
DIME Test ID: 2023-05-24-96-2 AASHTO T209-22 (Verified)
DIME Test ID: 2023-05-24-96-3 AASHTO T275-07r12 (Verified)