Sample Record

Owner Lab

  • CT D01 - Crescent City Field Laboratory

DIME Sample ID 2024-01-18-3

Project Information

Project IdentifiersProject ID: 215620
DEA: 01436404
EFIS: 0100000193
DIST-CO-RTE-PM01-DN-101-35.8/36.5
Award Date07/11/2022
Closeout DateNot set
Work DescriptionDr. Fine Bridge Replacement
Location DescriptionDR. FINE BRIDGE REPLACEMENT FROM LAKE EARL DR TO S FRED D. HAIGHT DR ON HWY 101 ACROSS SMITH RIVER.
QA Service Level1 (Verified on 03/26/2021)

Sample Information

Sample Taken Date01/18/2024 Sample Unique Key3
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing01/22/2024
Sample typeQuality Assurance A brief description of the sample6x12 concrete cylinders
The quantity of what the sample constitutes3 cy From where was the sample collectedJob Site
First name of sampler or witnessed byJoshua Last name of sampler or witnessed byErler
Title of samplerASR Telephone number of sampler7074985107
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameTidewater Starry pit Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberSR Minor Structure
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected58966
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedDetour Abutment 6 Where the material sample would have been placed if not sampledTransition block
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2024-01-18-3-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersJoshua Erler, CT D01 - Crescent City Field Laboratory 02/01/2024Joshua Erler
No
14 Day break Transition blocks Info

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2024-01-18-3-1 CTM 521-June 2020