Sample Record

Owner Lab

  • CT D06 - Millbrook Field Laboratory

DIME Sample ID 2023-11-22-37

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 215420
DEA: 060R2104
EFIS: 0614000058
DIST-CO-RTE-PM06-MAD-41-6.2/9.2
Award Date01/18/2023
Closeout DateNot set
Work DescriptionFOR CONSTRUCTION ON STATE HIGHWAY IN MADERA COUNTY NEAR MADERA FROM 0.1 MILE NORTH OF AVENUE 15 TO 2.2 MILES NORTH OF FRIANT MADERA CANAL BRIDGE
Location DescriptionMADERA COUNTY NEAR MADERA FROM 0.1 MILE NORTH OF AVENUE 15 TO 2.2 MILES NORTH OF FRIANT MADERA CANAL BRIDGE
QA Service Level1 (Verified on 01/06/2021)

Sample Information

Sample Taken Date11/22/2023 Sample Unique Key37
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/23/2023
Sample typeAcceptance A brief description of the sample6 Cylinders 4x8
The quantity of what the sample constitutes6 cylinders From where was the sample collectedJob Site
First name of sampler or witnessed byGerzon Last name of sampler or witnessed byceja
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameBuliders Concrete Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberND22023
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected0000
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedwing wall DS # 12 Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2023-11-22-37-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersTomas Silva, CT D06 - Millbrook Field Laboratory12/20/2023Tomas Silva
Yes
12/20/2023

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-11-22-37-1 CTM 521-June 2020 (Verified)