Sample Record
Owner Lab
- CT HQ - FFS - Skid Testing
DIME Sample ID 2023-12-05-19
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 6928 DEA: 041637U3 EFIS: 0400020166 |
---|---|
DIST-CO-RTE-PM | 04-SF-101-8.2/9.8, 6.9/7.1 |
Award Date | Not set |
Closeout Date | 07/12/2019 |
Work Description | P3 project, Doyle Drive Phase 2, Remaining elements of Presidio Parkway, including NB Presidio Viaduct and Battery Tunnel, Main Post Tunnels, and new Girard Road Interchange w/direct connection to the Presidio. |
Location Description | San Francisco Presidio, Southern approach to Golden Gate Bridge |
QA Service Level | 2 (Verified on 02/07/2013) |
Sample Information
Sample Taken Date | 12/05/2023 | Sample Unique Key | 19 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/13/2023 |
Sample type | Acceptance | A brief description of the sample | BRIDGE DECK |
The quantity of what the sample constitutes | BRIDGE DECK | From where was the sample collected | Job Site |
First name of sampler or witnessed by | HARISH | Last name of sampler or witnessed by | THAKUR |
Title of sampler | Telephone number of sampler | 9152961873 | |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | JOB SITE | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Roadway/Bridge Surface | Pavement Surface Type | PCC (Portland Cement Concrete) |
---|---|---|---|
Type of Traffic Control Provided | Stationary Lane Closure | DIST-CO-RTE | |
Direction of Travel | Post Mile | ||
Lanes to be Tested | Station |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-12-05-19-1 CTM 342-August 2012 (Verified)
DIME Test ID: 2023-12-05-19-2 CTM 342-August 2012 (Verified)