Sample Record

Owner Lab

  • CT D07 - Materials Field Laboratory, Unit 1953

DIME Sample ID 2023-11-08-48

Project Information

Project IdentifiersProject ID: 994579
DEA: 070W4004
EFIS: 0722000046
DIST-CO-RTE-PM07-VEN-101-30.9/R36.3;R40.6/R43.6
Award Date05/16/2023
Closeout DateNot set
Work DescriptionCONCRETE PAVEMENT SLABS REPLACEMENT & SLURRY SHOULDER.
Location DescriptionVENTURA COUNTY IN AND NEAR VENTURA FROM VENTURA RIVER BRIDGE TO 0.4 MILE SOUTH OF PADRE JUAN CANYON ROAD OVERCROSSING AND FROM 0.4 MILE NORTH OF PUNTA GORDA PEDESTRIAN UNDERCROSSING TO BATES ROAD UNDERCROSSING.
QA Service Level1 (Verified on 07/24/2023)

Sample Information

Sample Taken Date11/08/2023 Sample Unique Key48
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing11/08/2023
Sample typeAcceptance A brief description of the sampleISR-RSC Beams
The quantity of what the sample constitutes150 CY From where was the sample collectedJob Site
First name of sampler or witnessed byPhilip Last name of sampler or witnessed byMaquiran
Title of samplerMREA Telephone number of sampler(213) 358-1518
Laboratory sample identification23-1956 Linked DIME Sample ID
The fabricator/manufacturer/facility nameShort Load Concrete Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberCTS-65-GBR
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected1
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collected from volumetric concrete truck mixers Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2023-11-08-48-1CTM 524-March 2013: Method of Test for Flexural Strength Of Rapid Strength ConcretePhillip Maquiran, CT D07 - Materials Field Laboratory, Unit 195311/11/2023Phillip Maquiran
Yes
11/11/2023

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-11-08-48-1 CTM 524-March 2013 (Verified)