Sample Record

Owner Lab

  • CT HQ - Sacramento Structural Materials Testing Laboratory

DIME Sample ID 2023-09-25-63

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 215753
DEA: 050N72U4
EFIS: 0520000169
DIST-CO-RTE-PM05-SB-101-4.4/R7.7
Award Date03/01/2021
Closeout DateNot set
Work DescriptionPlease cc Office Engineer Ni Nyoman Paul on reports sent to RE and SR. Construct High Occupancy Vehicle (HOV) lanes on U.S. Route 101 and rehabilitation - Segment 4B.
Location Description101 freeway in Summerland, CA
QA Service Level1 (Verified on 05/06/2021)

Sample Information

Sample Taken Date09/25/2023 Sample Unique Key63
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing10/18/2023
Sample typeQuality Assurance A brief description of the sampleCoupler
The quantity of what the sample constitutes128 From where was the sample collectedJob Site
First name of sampler or witnessed byVictor Last name of sampler or witnessed byDelacruz
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameSW8 Pile Cap Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeSMTL TM5 - Couplers Production or Authorization TestingProduction Testing
Service or UltimateService Material Standard CodeASTM A706
Material Grade60 Rebar ManufacturerCMC
Coupler ManufacturerDayton Superior Intermediate Assembler or Fabricator
Rebar Size#8 Coupler ModelD250SCA
Coating StandardsUncoated Shape of RebarStraight
Rebar Hoop Diameter Rebar Hoop Fabricator
Coupler Component Heat/Lot Number(s)4000003591 4000005513 Rebar Heat Number(s)9000124
Rebar Size 2 Coupler Unique IDSL-17-01

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2023-09-25-63-1CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)aauvinen, CT HQ - Sacramento Structural Materials Testing Laboratory10/18/2023aauvinen
Yes
10/18/2023Service Splice
2023-09-25-63-2CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)aauvinen, CT HQ - Sacramento Structural Materials Testing Laboratory10/18/2023aauvinen
Yes
10/18/2023Service Splice
2023-09-25-63-3CTM 670-December 2013: Method of Tests for Mechanical and Welded Reinforcing Steel Splices (Cyclical/Fatique Tensile with Slip)aauvinen, CT HQ - Sacramento Structural Materials Testing Laboratory10/18/2023aauvinen
Yes
10/18/2023Service Splice

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-09-25-63-1 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-09-25-63-2 CTM 670-December 2013 (Verified)
DIME Test ID: 2023-09-25-63-3 CTM 670-December 2013 (Verified)