Sample Record

Owner Lab

  • Alta Vista Solutions - Whittier

DIME Sample ID 2023-09-09-14

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 993664
DEA: 073311U4
EFIS: 0719000098
DIST-CO-RTE-PM07-VEN-23,101-R3.3/R3.7,0.2/40.8
Award Date08/31/2022
Closeout DateNot set
Work DescriptionCONSTRUCT GUARDRAILS AND CONCRETE BARRIER.
Location DescriptionVENTURA COUNTY IN THOUSAND OAKS, CAMARILLO, OXNARD AND VENTURA ON ROUTE 101 FROM THE LOS ANGELES /VENTURA COUNTY LINE TO OLD PACIFIC COAST HIGHWAY AND ON ROUTE 23 FROM ROUTE 23/101 SEPARATION TO HILLCREST DRIVE
QA Service Level1 (Verified on 05/11/2022)

Sample Information

Sample Taken Date09/09/2023 Sample Unique Key14
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing09/09/2023
Sample typeQuality Assurance A brief description of the sampleClass 2 Aggregate Base
The quantity of what the sample constitutes1190 sqft From where was the sample collectedSource
First name of sampler or witnessed byManuel Last name of sampler or witnessed byUy
Title of sampler Telephone number of sampler
Laboratory sample identification23-1379 Linked DIME Sample ID
The fabricator/manufacturer/facility namen/a Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)n/a
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedCTM 231 Test Holes
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/8 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2023-09-09-14-1CTM 231-March 2013: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates Using Nuclear GagesEmanuel Uy, Alta Vista Solutions - Whittier09/09/2023SoCal Reports
Yes
09/26/2023
2023-09-09-14-2CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and AggregatesManuel Uy, Alta Vista Solutions - Whittier09/09/2023SoCal Reports
Yes
09/26/2023

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-09-09-14-1 CTM 231-March 2013 (Verified)
DIME Test ID: 2023-09-09-14-2 CTM 216-June 2011 (Verified)