Sample Record

Owner Lab

  • CT D05 - Whitley Gardens Field Laboratory

DIME Sample ID 2023-08-09-70

Project Information

Project IdentifiersProject ID: 994443
DEA: 053307C4
EFIS: 0514000028
DIST-CO-RTE-PM05-SLO-41,46-44.5/45.3,54.0/57.8
Award Date02/27/2023
Closeout DateNot set
Work DescriptionWye Segment - Route 41/46 Separation
Location DescriptionNot set
QA Service Level1 (Verified on 12/16/2022)

Sample Information

Sample Taken Date08/09/2023 Sample Unique Key70
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/10/2023
Sample typeQuality Assurance A brief description of the sample4x8 Concrete Cylinders
The quantity of what the sample constitutesDS-36 Headwall From where was the sample collectedJob Site
First name of sampler or witnessed byTim Last name of sampler or witnessed byStover
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameAlliance Ready Mix Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameDS-36 Headwall

Material Information

Material TypeConcrete The concrete mix design number635D4NOP
The truck number from where the sample was collected The batch plant ticket number from where the sample was collectedNA
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedFrom Mix Truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2023-08-09-70-1CTM 521-June 2020: Method of Test for Compressive Strength of Molded Concrete CylindersKyle Engen, CT D05 - Whitley Gardens Field Laboratory09/06/2023Kyle Engen
Yes
09/07/2023

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-08-09-70-1 CTM 521-June 2020 (Verified)
File NameExtensionDate UploadedTest IDActions
05-3307C4_CTM 521_KEE_230906_DS-36_Headwall_28 Day_3x_1pdf09/07/20232023-08-09-70-1   Info