Sample Record
Owner Lab
- CT D05 - Monterey Construction Field Laboratory
DIME Sample ID 2023-08-09-8
Project Information
Project Identifiers | Project ID: 214627 DEA: 05344904 EFIS: 0500000505 |
---|---|
DIST-CO-RTE-PM | 05-SBT-156-3/R8.2 |
Award Date | 05/19/2022 |
Closeout Date | Not set |
Work Description | SAN BENITO ROUTE 156 IMPROVEMENT PROJECT SAN BENITO RTE 156 IMPROVEMENT PROJECT; INCLUDES NEW BRIDGE AND WIDENING OF EXISTING BRIDGE. |
Location Description | SAN BENITO COUNTY IN AND NEAR SAN JUAN BAUTISTA FROM THE ALAMEDA TO 0.2 MILE EAST OF FOURTH STREET/BUSINESS ROUTE 156 |
QA Service Level | 1 (Verified on 01/14/2020) |
Sample Information
Sample Taken Date | 08/09/2023 | Sample Unique Key | 8 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 08/10/2023 |
Sample type | Quality Assurance | A brief description of the sample | 6x12 concrete cylinders |
The quantity of what the sample constitutes | 4x 6x12 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Carson | Last name of sampler or witnessed by | Sperber |
Title of sampler | ASR | Telephone number of sampler | 8054589613 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | Don Chapin | Transportation Laboratory (TL) Number | 213685 |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Concrete | The concrete mix design number | CAS5901 |
---|---|---|---|
The truck number from where the sample was collected | 1166 | The batch plant ticket number from where the sample was collected | 235798 |
Concrete batch plant | Hollister Don Chapin | The fabricator/manufacturer designation for the sample | |
A detailed description of where the material sample was collected | CHUTE FROM TRUCK | Where the material sample would have been placed if not sampled | |
From Lot No. | Bag Lot No. |
Submitted Tests
DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
---|---|---|---|---|---|---|---|---|
No results found. |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |