Sample Record
Owner Lab
- CT HQ - Sacramento Asphalt Binder Laboratory
DIME Sample ID 2023-07-31-49
Project Information
Project Identifiers | Project ID: 994244 DEA: 051F6204 EFIS: 0514000039 |
---|---|
DIST-CO-RTE-PM | 05-SCR-152-1.9 |
Award Date | 11/29/2022 |
Closeout Date | 02/14/2024 |
Work Description | WIDEN BRIDGE, CONCRETE BARRIER, AND MODIFY ELECTRICAL SYSTEM. |
Location Description | SANTA CRUZ COUNTY NEAR WATSONVILLE AT CORRALITOS CREEK BRIDGE |
QA Service Level | 1 (Verified on 09/19/2022) |
Sample Information
Sample Taken Date | 07/31/2023 | Sample Unique Key | 49 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 08/07/2023 |
Sample type | Quality Assurance | A brief description of the sample | SS-1H 1jug tack coat emulsion |
The quantity of what the sample constitutes | Tack between lifts | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Wesley | Last name of sampler or witnessed by | Rider |
Title of sampler | TET | Telephone number of sampler | |
Laboratory sample identification | Linked DIME Sample ID | 2023-07-31-39 | |
The fabricator/manufacturer/facility name | Reed and Graham, Inc | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Asphaltic Emulsion | Emulsion Grade | SS-1h |
---|---|---|---|
Lot Number | 1 | Sub Lot | 2 |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-07-31-49-1 AASHTO T59-16 (Verified)