Sample Record

Owner Lab

  • CT D06 - Bakersfield Field Laboratory

DIME Sample ID 2023-08-02-2

Sample is locked from editing. info

Project Information

Project IdentifiersProject ID: 215180
DEA: 060Q9204
EFIS: 0614000010
COOP: 061764
DIST-CO-RTE-PM06-KER-99-10.4/21.2
Award Date12/08/2020
Closeout DateNot set
Work DescriptionCONSTRUCT CRCP AND HMA (TYPE A) PAVEMENT.
Location DescriptionKERN COUNTY IN AND NEAR BAKERSFIELD FROM 0.4 MILE SOUTH OF OLD US 99 OVERCROSSING TO 0.1 MILE NORTH OF WHITE LANE OVERCROSSING
QA Service Level1 (Verified on 09/14/2020)

Sample Information

Sample Taken Date08/02/2023 Sample Unique Key2
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing08/02/2023
Sample typeDepartment Acceptance A brief description of the sampleCRCP - 12 field beams and 4 standard beams Set # 2
The quantity of what the sample constitutes1150cy load # 115 From where was the sample collectedSource
First name of sampler or witnessed byJames Last name of sampler or witnessed byWatson
Title of sampler Telephone number of sampler6615498281
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameHwy 223 off ramp sb 99 Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeConcrete The concrete mix design numberG3-21-pCC-263
The truck number from where the sample was collected34 The batch plant ticket number from where the sample was collected319
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedBack of Truck Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2023-08-02-2-1CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure MethodJames Watson, CT D06 - Bakersfield Field Laboratory08/02/2023Kulwinder Rai
Yes
08/02/2023P-3 1150CY 12 field and 4 standard cure beams beam set 75 and 76 date of paving 8/1/23 night
2023-08-02-2-2CTM 518-June 2010: Method of Test for Unit Weight of Fresh ConcreteJames Watson, CT D06 - Bakersfield Field Laboratory08/02/2023Kulwinder Rai
Yes
08/02/2023P-3 1150CY 12 field and 4 standard cure beams beam set 75 and 76 date of paving 8/1/23 night
2023-08-02-2-3CTM 533-June 2010: Method of Test for Ball Penetration in Fresh Portland Cement ConcreteJames Watson, CT D06 - Bakersfield Field Laboratory08/02/2023Kulwinder Rai
Yes
08/02/2023P-3 1150CY 12 field and 4 standard cure beams beam set 75 and 76 date of paving 8/1/23 night
2023-08-02-2-4CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement ConcreteJames Watson, CT D06 - Bakersfield Field Laboratory08/02/2023Kulwinder Rai
Yes
08/02/2023P-3 1150CY 12 field and 4 standard cure beams beam set 75 and 76 date of paving 8/1/23 night
2023-08-02-2-5CTM 523-May 2020: Method of Test for Flexural Strength of ConcreteJames Watson, CT D06 - Bakersfield Field Laboratory08/15/2023Kulwinder Rai
Yes
08/15/2023Field cure beam Set # 76
2023-08-02-2-6CTM 523-May 2020: Method of Test for Flexural Strength of ConcreteNeale Brown, CT D06 - Bakersfield Field Laboratory08/30/2023Kulwinder Rai
Yes
08/30/2023Standard cure beams

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-08-02-2-1 CTM 504-June 2010 (Verified)
File NameExtensionDate UploadedTest IDActions
06-0Q9204_37085_230801_JW_plantreportpdf08/02/20232023-08-02-2-1   Info

DIME Test ID: 2023-08-02-2-2 CTM 518-June 2010 (Verified)
File NameExtensionDate UploadedTest IDActions
06-0Q9204_37085_230801_JW_plantreportpdf08/02/20232023-08-02-2-2   Info

DIME Test ID: 2023-08-02-2-3 CTM 533-June 2010 (Verified)
File NameExtensionDate UploadedTest IDActions
06-0Q9204_37085_230801_JW_plantreportpdf08/02/20232023-08-02-2-3   Info

DIME Test ID: 2023-08-02-2-4 CTM 557-July 2012 (Verified)
File NameExtensionDate UploadedTest IDActions
06-0Q9204_37085_230801_JW_plantreportpdf08/02/20232023-08-02-2-4   Info

DIME Test ID: 2023-08-02-2-5 CTM 523-May 2020 (Verified)
File NameExtensionDate UploadedTest IDActions
06-0Q9204_37085_230801_14D_76pdf08/15/20232023-08-02-2-5   Info
06-0Q9204_37085_230801_14D_76pdf08/15/20232023-08-02-2-5   Info

DIME Test ID: 2023-08-02-2-6 CTM 523-May 2020 (Verified)
File NameExtensionDate UploadedTest IDActions
06-0Q9204_37085_230801_28D_75pdf08/30/20232023-08-02-2-6   Info