Sample Record
Owner Lab
- CT D09 - Bishop Field Laboratory
DIME Sample ID 2023-06-19-35
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 994400 DEA: 09378904 EFIS: 0919000003 |
---|---|
DIST-CO-RTE-PM | 09-KER-14-46.2/52.8 |
Award Date | 01/06/2023 |
Closeout Date | 12/27/2023 |
Work Description | RHMA PLACED OVER PARTIAL DEPTH RECYCLING. |
Location Description | KERN COUNTY NEAR ARMISTEAD FROM 1.1 MILES NORTH OF REDROCK CANYON ROAD TO 3.5 MILES SOUTH OF FREEMAN GULCH BRIDGE |
QA Service Level | 1 (Verified on 05/30/2023) |
Sample Information
Sample Taken Date | 06/19/2023 | Sample Unique Key | 35 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/23/2023 |
Sample type | Department Acceptance | A brief description of the sample | RHMA CORES |
The quantity of what the sample constitutes | 3 cores | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Francisco | Last name of sampler or witnessed by | Caballero |
Title of sampler | QA | Telephone number of sampler | |
Laboratory sample identification | Cores-10 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | Griffith construction | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | |
Sublot number | HMA Mix Number |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-06-19-35-1 AASHTO T269-14 (Verified)
DIME Test ID: 2023-06-19-35-2 AASHTO T275-07r12 (Verified)