Sample Record
Owner Labs
- CT SC - 3674 - Pacifica 2
- CT HQ - Sacramento Concrete Testing Laboratory
DIME Sample ID 2015-11-16-2
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 7463 DEA: 042640U4 EFIS: 0412000195 |
---|---|
DIST-CO-RTE-PM | 04-SON-101-0.9/3.6 |
Award Date | 11/02/2012 |
Closeout Date | 06/03/2020 |
Work Description | CONSTRUCT PETALUMA BLVD SOUTH INTERCHANGE, REPLACE PETALUMA RIVER BR |
Location Description | SONOMA COUNTY IN AND NEAR PETALUMA FROM GUNN DRIVE TO ROUTE 101/116 SEPARATION AND OVERHEAD |
QA Service Level | 1 (Verified on 09/11/2012) |
Sample Information
Sample Taken Date | 11/16/2015 | Sample Unique Key | 2 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 11/20/2015 |
Sample type | Quality Assurance | A brief description of the sample | 2 6x12 concrete cylinders |
The quantity of what the sample constitutes | 6 CY Girder Splice Pier 2 Stage 2 | From where was the sample collected | Job Site |
First name of sampler or witnessed by | Jeremy | Last name of sampler or witnessed by | Light |
Title of sampler | TEC | Telephone number of sampler | 510) 385-7179 |
Laboratory sample identification | Unknown | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Shamrock | Transportation Laboratory (TL) Number | Unknown |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | 200295 |
Structure name | Petaluma River Bridge |
Material Information
Material Type | Concrete | The concrete mix design number | 4700P |
---|---|---|---|
The truck number from where the sample was collected | 1203 | The batch plant ticket number from where the sample was collected | 432558 |
Concrete batch plant | 04 | The fabricator/manufacturer designation for the sample | Unknown |
A detailed description of where the material sample was collected | CHUTE FROM TRUCK | Where the material sample would have been placed if not sampled | Girder Splices Stage 2 N S Pier 2 |
From Lot No. | Not set | Bag Lot No. | Not set |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2015-11-16-2-1 ASTM C39-10 (Verified)