Sample Record

Owner Lab

  • CT HQ - Sacramento Asphalt Binder Laboratory

DIME Sample ID 2023-05-22-75

Project Information

Project IdentifiersProject ID: 212496
DEA: 024E4504
EFIS: 0200020286
DIST-CO-RTE-PM02-LAS,MOD-139,299-VAR
Award Date07/28/2020
Closeout Date08/14/2023
Work DescriptionPLACE HMA, REPLACE DRAINAGE, CULVERT, ELECTRICAL AND LIGHTING SYSTEMS.
Location DescriptionLASSEN AND MODOC COUNTIES ON ROUTE 139 AT 0.1 MILE NORTH OF LASSEN COUNTY LINE AND ON ROUTE 299 AT VARIOUS LOCATONS FROM 0.4 MILE WEST OF BOYD HILL LOOKOUT ROAD TO 0.6 MILE EAST OF COUNTY ROAD 87
QA Service Level1 (Verified on 06/06/2017)

Sample Information

Sample Taken Date05/22/2023 Sample Unique Key75
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/07/2023
Sample typeAcceptance A brief description of the samplePG 58-34M
The quantity of what the sample constitutes2 of 2 cans From where was the sample collectedJob Site
First name of sampler or witnessed byC Last name of sampler or witnessed byBryant
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameHat Creek - Shaw Pit Facility Transportation Laboratory (TL) NumberC079243
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeAsphalt Binder Performance GradePG 58-34 M
ModifiedYes Lot number
Sublot number Tank number
Time of sample HMA Supplier
Certified Asphalt SupplierValero Marketing & Supply - Benicia CA MultigradeNo
Multigrade Type Asphalt Binder Mix Number

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2023-05-22-75-1AASHTO T315-22: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)Raul Cardenas, CT HQ - Sacramento Asphalt Binder Laboratory06/09/2023Raul Cardenas
Yes
06/09/2023OG

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-05-22-75-1 AASHTO T315-22 (Verified)