Sample Record

Owner Lab

  • CT HQ - FFS - Skid Testing

DIME Sample ID 2023-06-06-6

Project Information

Project IdentifiersProject ID: 214892
DEA: 06442554
EFIS: 0612000176
COOP: 061699
DIST-CO-RTE-PM06-KER-46-29.7/31.9
Award Date01/08/2021
Closeout DateNot set
Work DescriptionCONVERT 2-LANE TO 4-LANE HMA PAVEMENT AND CONSTRUCT NEW BRIDGE.
Location DescriptionKERN COUNTY AT AND NEAR LOST HILLS FROM 0.2 MILE WEST OF CALIFORNIA AQUEDUCT BRIDGE TO 1.4 MILES EAST OF LOST HILLS ROAD
QA Service Level1 (Verified on 06/17/2020)

Sample Information

Sample Taken Date06/06/2023 Sample Unique Key6
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing06/06/2023
Sample typeAcceptance A brief description of the sampleBRIDGE DECK
The quantity of what the sample constitutesBRIDGE DECK From where was the sample collectedJob Site
First name of sampler or witnessed byHARISH Last name of sampler or witnessed byThakur
Title of sampler Telephone number of sampler4152464791
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameBRIDGE DECK Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypeNot set
Type of Traffic Control ProvidedNot set DIST-CO-RTENot set
Direction of TravelNot set Post MileNot set
Lanes to be TestedNot set StationNot set

Submitted Tests

DIME Test IDTest MethodTester Name, Testing LabDate TestedSubmitted ByVerified?Release DateTest CommentsActions
2023-06-06-6-1CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)Harish Thakur, CT HQ - FFS - Skid Testing06/06/2023Harish Thakur
Yes
06/08/2023EB APPROACH
2023-06-06-6-2CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)Harish Thakur, CT HQ - FFS - Skid Testing06/06/2023Harish Thakur
Yes
06/08/2023EB BRIDGE
2023-06-06-6-3CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)Harish Thakur, CT HQ - FFS - Skid Testing06/06/2023Harish Thakur
Yes
06/08/2023EB DEPARTURE
2023-06-06-6-4CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)Harish Thakur, CT HQ - FFS - Skid Testing06/06/2023Harish Thakur
Yes
06/08/2023WB APPROACH
2023-06-06-6-5CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)Harish Thakur, CT HQ - FFS - Skid Testing06/06/2023Harish Thakur
Yes
06/08/2023WB BRIDGE
2023-06-06-6-6CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)Harish Thakur, CT HQ - FFS - Skid Testing06/06/2023Harish Thakur
Yes
06/08/2023WB DEPARTURE
2023-06-06-6-7CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)Harish Thakur, CT HQ - FFS - Skid Testing06/12/2023Harish Thakur
Yes
06/13/2023RETEST WB BRIDGE
2023-06-06-6-8CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)Harish Thakur, CT HQ - FFS - Skid Testing06/12/2023Harish Thakur
Yes
06/13/2023RETEST EB APPROACH

Sample File Attachments

File NameExtensionDate UploadedActions
No results found.

Test File Attachments


DIME Test ID: 2023-06-06-6-1 CTM 342-August 2012 (Verified)
DIME Test ID: 2023-06-06-6-2 CTM 342-August 2012 (Verified)
DIME Test ID: 2023-06-06-6-3 CTM 342-August 2012 (Verified)
DIME Test ID: 2023-06-06-6-4 CTM 342-August 2012 (Verified)
DIME Test ID: 2023-06-06-6-5 CTM 342-August 2012 (Verified)
DIME Test ID: 2023-06-06-6-6 CTM 342-August 2012 (Verified)
DIME Test ID: 2023-06-06-6-7 CTM 342-August 2012 (Verified)
DIME Test ID: 2023-06-06-6-8 CTM 342-August 2012 (Verified)