Sample Record
Owner Lab
- CT D06 - Visalia Field Laboratory
DIME Sample ID 2023-06-02-26
Sample is locked from editing. info
Project Information
Project Identifiers | Project ID: 215425 DEA: 06360244 EFIS: 0613000005 |
---|---|
DIST-CO-RTE-PM | 06-TUL-99-30.6/35.2 |
Award Date | 04/23/2021 |
Closeout Date | Not set |
Work Description | Widen Freeway & Bridge Construction (Concrete Bridge) |
Location Description | Not set |
QA Service Level | 1 (Verified on 11/01/2021) |
Sample Information
Sample Taken Date | 06/02/2023 | Sample Unique Key | 26 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/02/2023 |
Sample type | Verification | A brief description of the sample | 1x4 concrete aggregates |
The quantity of what the sample constitutes | 34 tons | From where was the sample collected | Supplier |
First name of sampler or witnessed by | Doug | Last name of sampler or witnessed by | Ruff |
Title of sampler | Consultant Tester | Telephone number of sampler | 5594670032 |
Laboratory sample identification | Linked DIME Sample ID | ||
The fabricator/manufacturer/facility name | CalPort Tul Plant | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name | TUL 99- J St Bridge - Ave 264 |
Material Information
Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | SMARA 91-54-0038 |
---|---|---|---|
The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
The plant number | A detailed description of where the material sample was collected | Conveyor Belt | |
Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
The concrete mix design number | 85Q41SOP | Lot number | |
Sublot number | Aggregate Mix Number | 85Q41SOP |
Submitted Tests
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
No results found. |
Test File Attachments
DIME Test ID: 2023-06-02-26-1 CTM 202-November 2011 (Verified)
File Name | Extension | Date Uploaded | Test ID | Actions |
---|---|---|---|---|
06-360244_37000_230602_SA_TUL Plant | xlsx | 06/05/2023 | 2023-06-02-26-1 | Info |
DIME Test ID: 2023-06-02-26-2 CTM 202-November 2011 (Verified)
DIME Test ID: 2023-06-02-26-3 CTM 217-June 2011 (Verified)
DIME Test ID: 2023-06-02-26-4 CTM 227-December 2014 (Verified)
File Name | Extension | Date Uploaded | Test ID | Actions |
---|---|---|---|---|
06-360244_37000_230602_SA_TUL Plant | 06/05/2023 | 2023-06-02-26-4 | Info |