Sample Record
Owner Lab
- CT D12 - Huntington Beach Field Laboratory
DIME Sample ID 2023-05-18-41
Project Information
Project Identifiers | Project ID: 993631 DEA: 120S8904 EFIS: 1221000058 |
---|---|
DIST-CO-RTE-PM | 12-ORA-1-R0.1/R1.0 |
Award Date | 05/02/2022 |
Closeout Date | 09/07/2023 |
Work Description | COLD PLANE AC PAVEMENT AND PLACE RHMA. |
Location Description | ORANGE COUNTY IN DANA POINT AND SAN JUAN CAPISTRANO FROM ROUTE 5/1 SEPARATION TO SAN JUAN CREEK BRIDGE |
QA Service Level | 1 (Verified on 03/21/2022) |
Sample Information
Sample Taken Date | 05/18/2023 | Sample Unique Key | 41 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/22/2023 |
Sample type | Quality Assurance | A brief description of the sample | 3/4 HMA-A |
The quantity of what the sample constitutes | 100 TONS | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | JIMMY CUONG | Last name of sampler or witnessed by | PHAM |
Title of sampler | Lab Technician | Telephone number of sampler | 9492798487 |
Laboratory sample identification | 23-0439 | Linked DIME Sample ID | |
The fabricator/manufacturer/facility name | RJ NOBLE - ORANGE | Transportation Laboratory (TL) Number | |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
Structure name |
Material Information
Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
---|---|---|---|
HMA Grading | 3/4 inch | Lot number | |
Sublot number | HMA Mix Number | 36R2508SPWEO |
Submitted Tests
DIME Test ID | Test Method | Tester Name, Testing Lab | Date Tested | Submitted By | Verified? | Release Date | Test Comments | Actions |
---|---|---|---|---|---|---|---|---|
No results found. |
Sample File Attachments
File Name | Extension | Date Uploaded | Actions |
---|---|---|---|
23-0439-HMA-A-36R2508SPWEO | 05/22/2023 | Info |